Skip to content

Defend the decision.

See which geopolitical scenarios move your numbers, how likely they are, and why — before the board asks.

Worked example

Engine selection for a 240 MW behind-the-meter gas plant

A Southeastern power developer · Southeastern United States · values in USD millions

  • Tariffs hold at current levels

    Probability
    41%
    Expected value
    $212M
    Downside (P10)
    $118M
    Evidence
    9 rows
  • Tariffs escalate; turbine lead times stretch

    Probability
    27%
    Expected value
    $96M
    Downside (P10)
    −$34M
    Evidence
    11 rows
  • Tariffs reverse; OEM backlog clears

    Probability
    14%
    Expected value
    $268M
    Downside (P10)
    $171M
    Evidence
    6 rows
  • Gas regime shifts higher

    Probability
    18%
    Expected value
    $131M
    Downside (P10)
    $12M
    Evidence
    8 rows

A real decision, run in Compass. Four scenarios, their probabilities from the evidence table, and the downside through the project's own numbers. As of November 6, 2026.

Who it is for

  • Power developers and IPPs — tariffs on turbines and transformers, gas regimes, interconnection policy.

  • Commodity producers — sanctions on buyers, chokepoints, demand shocks.

  • Data-center developers — chip export controls, power policy, tenant concentration.

  • Lenders and infra investors — the downside case every IC memo needs.

How it is built and checked

  1. Scenarios.

    Your asset, three to five named scenarios, each decomposed into the drivers that set its value.

  2. Evidence.

    Each scenario's probability comes from a table of evidence you can read, rate, and override. The AI keeps it current; you decide.

  3. Memo.

    One export the board, the IC, or the lender can inspect, with the reasoning attached.

How a Compass analysis is built and checked